Abstract
In Maruzen Industry, we have made virtual factory that simulate daily order and daily product of factory in 1/8 model, to simulate our industry. And we have optimized the way of scheduling and optimum buffer through this virtual simulator. We already knew that pull type scheduling is effective in our mind, but we had thought there are a little change and we did not want to change our system by then. Through approximate optimization, we noticed that there are big differences between push type scheduling, and there seems no change inside factory. So, we have changed our scheduling scheme, and this is a report of the fact in our industry.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The Proceedings of Design & Systems Conference
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.