As an important oil industry base in China, Shengli oilfield has infrastructure supporting facilities for power generation, transmission, substation, and distribution. Based on the grid data, a BPA simulation model is built for the oilfield area, and a grid optimization scheme is proposed for the problems of the existing 220 kV grid in the Shengli oilfield. The simulation results show that the safety and stability of the oilfield grid are improved under the optimized scheme, which verifies the feasibility and effectiveness of the scheme.