Abstract
Summary The initial impetus for developing 2,000,000-lbf landing strings was the fact that failures in the field were being experienced with loads less than equipment ratings. This paper pertains to the technological development of a completely integrated landing system that provides the ability to extend the deepwater drilling and completion envelope. This system comprises an elevator, slipless spider, and landing string—all specifically designed to land heavy-casing strings in deepwater wells and thus overcome the load limitations of conventional equipment. All stages of evolution are analyzed, including research, development, design, verification testing, manufacturing, prooftesting, running, handling, and actual case histories detailing field use. Actual verification-testing loads were over 5,200,000 lbf, and proof-testing loads were 3,000,000 lbf. Unique manufacturing challenges and solutions associated with the production of ultrathick wall landing strings, with 2,000,000 lbf at super-premium-yield ratings1 (90% remaining body wall), a represented in detail.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.