Abstract

In the in-service inspection of sodium cooled fast reactors, an examination by continuous leak monitoring is considered for components constituting a sodium boundary. The continuous leak monitoring examinations are premises in a LBB (leak before break) being established. In previous LBB evaluation, the axial crack of the elbow flank has been evaluated, because in the piping system of the fast reactor with high thermal expansion, high stress is generated in the elbows flank. However, the LBB evaluations for circumferential cracks are important in the point of continuous leak monitoring in the in-service inspection. In this study, the load conditions in the LBB assessments for circumferential cracks were examined and LBB characteristics of 1 class 1 pipes of the prototype fast breeder reactor "Monju" were evaluated as an example.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.