Abstract
Sedentary activity is a growing concern for college students who spend 8+ hours in sedentary activities and do not meet recommend physical activity guidelines. After sitting, individuals can experience impaired lumbar range of motion (LROM), a major cause of low back pain (LBP). This study aims to quantify the effects of sedentary activity on pain and lumbar and hip flexibility of college students. Healthy students (18-26 years) were recruited for 1 research session. Pre-Sedentary measurements including self-reported pain (Visual Analog Scale [VAS], flexion (F) & extension (E) LROM [Modified-Modified Schober Test, MMST] and hip ROM for extension [EXT], internal rotation [IR], and external rotation [ER]) were measured. Participants sat in a chair at a table for 50 min to simulate a class period. Participants rated pain at the end of sitting and upon initial stand. Post-Sedentary MMST and hip ROM measurements were measured and compared to Pre-Sedentary measurements using paired t-tests (p 50 min) may have a greater impact on pain and flexibility but research is necessary along with identifying interventions to break up sedentary time, address hip motion, and prevent potential pain.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have