Abstract

This chapter on concrete bridges since 1940, concentrates particularly on the early postwar period and deals with more recent bridges briefly and mainly from an evolutionary point of view. A paper on prestressed highway bridges in the UK, published in the Proceedings of the Institution of Civil Engineers in 1989,1 deals more fully with the more recent bridges as do some of the other references appended to the chapter. As well as the paper referred to above, an indispensible reference is the book Modern British Bridges2 which contains brief descriptions, often with drawings and photographs, of many bridges built or under construction between the end of the war and 1964. Introduction Concrete bridges after the war Early prestressed bridges in Britain — the 1940s and 1950s Early prestressed railway bridges Railway bridges after 1960 Larger bridges — 1954 onwards Smaller bridges since 1957 Precast bridges and standard beams Estuarial crossings Ancillary items Structural analysis Problems with prestressed bridges The changing character of bridges Postscript Acknowledgements References

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.