Abstract

Immunoprophylaxis with palivizumab is recommended for infants at high risk of RSV-related hospitalization. Palivizumab is an expensive sole-sourced biologic pharmaceutical available in single dose vials which expires 6 h upon reconstitution, resulting in potentially high rates of drug wastage. Palivizumab has a short shelf life and requires cold-chain storage making left-over inventory costly and undesirable. Principles of Lean production and Just-In-Time production can be applied to minimize wastage and costs. To describe the outcome of Lean management and Just-In-Time inventory control in the operations of a provincial RSV immunoprophylaxis program. The Manitoba RSV Immunoprophylaxis Program (MB RSVP) coordinates the use of palivizumab for eligible patients in the province of Manitoba, Canada, a region of 650,000 square km with population of 1.27 million. Yearly PDCA cycles using Lean management principles have resulted in a centralized provincial coordinating centre that manages RSV immunoprophylaxis including patient enrolment, coordination of injection through a network of health care providers (to allow for cohorting and vial sharing), just-in-time ordering and shipping of palivizumab to clinic sites, and continuious inventory tracking. Dosing reports from sites function as a Kanban system triggering future shipment of palivizumab. Regular discussion with all involved in the Program fosters involvement, problem solving, and continuous improvement. The overall objective is limitation of wastage while maximizing patient benefit. Over three seasons (2011–2014), the MB RSVP enrolled and organized RSV immunoprophylaxis for 868 patients with over 3500 doses provided. The Program was effective in limiting wastage of palivizumab (mg of drug ordered but not given to patient) to 10% (range 8.4% to 12.8% per year). Just-in-time ordering reduced left over inventory from 157 vials (in 2012) to 75 vials (in 2014) resulting in a decreased inventory carrying cost from $118,000 to $56,000 Canadian respectively ($752/50 mg). Using Lean business management principles and Just-In-Time inventory control resulted in minimum wastage of palivizumab and decreased yearly left-over inventory of palivizumab in a provincial RSV prophylaxis program.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call