Abstract

Dynamic changes in manufacturing sites influence whole production planning. Therefore, production planning should be treated as comprehensive. However, the production planning has been treated as separate, such as process planning, production scheduling aad so on. In this study, we use Zero-Suppressed Binary Decision Diagram (ZDD) to represent only combinations satisfying the constraints in the comprehensive solution space. By searching in the ZDD, feasible solution can be obtainedコn this paper, we describe how to solve the dynamic production planning problem using the ZDD. Experimental results demonstrate that the ZDD can create and represent only feasible combinations adapting to dynamic changes, quickly.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.