Abstract
The main purpose of this work is to apply thermoeconomics concepts to a projected steam injected gas turbine cogeneration system, which aims at providing the thermal and electrical demands of an industrial district sited in Cabo (Pernambuco, Brazil). The power plant is evaluated on the basis of the First and Second Laws of Thermodynamics. A thermoeconomic analysis, using the Theory of Exergetic Cost, was performed in order to determine the production costs of electricity and steam. Two hypothetical operational conditions, as regards the level of electric power generation, were considered.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.