Abstract

In manufacturing systems, the facility layout problem(FLP) and the job shop scheduling problem(JSSP) are two main factors influencing on productivity and efficiency of the systems, and a number of previous researches have dealt with these independently. However, FLP and JSSP need to be considered concurrently because the two factors affect each other’s performance, and the modularity of production lines in reconfigurable manufacturing system(RMS) makes it easy and cost-effective to change the facility layout. In this paper, we proposed an integrated algorithm considering FLP and JSSP simultaneously, and it was compared with a method that considers JSSP only. As a result, it was found that the modularity of RMS was worthwhile and the proposed integrated algorithm was effective in deriving optimal solution combination of FLP and JSSP.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.