Abstract

The execution order of the processes of the management system (MS) of the testing laboratory (TL), certified according to the requirements of the standard GOST ISO / IEC 17025-2019, is discussed. It was established that the process “8.9 Management Review” is the main process in managing activities in a testing laboratory. The interaction of this process with other MS TL processes is considered, in particular: “6.2 Personnel”, “6.4 Equipment”, “6.5 Metrological traceability”, “7.2 Selection, verification and validation of methods”, “7.6 Evaluation of measurement uncertainty”, “7.7 Ensuring the validity of results”, “7.10 Management of inappropriate work”, “8.5 Actions related to risks and opportunities”, “8.6 Improvement”, “8.7 Corrective actions”, “ 8.8. Internal Audits”, etc.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.