Abstract

The development permission system of the urbanization control area to achieve the district division was installed by the City Planning Act in 1968. At the time the Act was introduced there was a need for such regulations. However, as the population is now decreasing the drive for new construction has diminished. The application situation of the development permission system based on a land use plan in Hyogo Prefecture was investigated. As a result, the method of formulating a land use plan, the resident consultation process and the resulting adjustment of the land use plan were clarified. This was done in order to identify how best to provision for the urbanization control area.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call