Abstract

It took nearly 3 months from September 1954 to build and set-up the furnace and then about a year to accomplish its test operations and remodeling. The actual carburizing of work parts was commenced in January 1956 and on the whole satisfactory results were obtained. A brand of refined domestic propane gas was used, which did generally well enough but we found a generator of high performance was needed. An imported generator was used and continuously operated for nearly 11 months, giving good results without causing troubles. The deviation of carbon content in the pieces worked with this furnace was found very low as compared with that of pieces treated by the pack carburizing method in general use in Japan so far. Consequently we can predict a low deviation in the micro-structure, the effective case, the hardness and the deformation of the parts processed in this furnace.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.