Abstract

For the scheduling and the job assignment of the ship hull production design which is a process-based work, we suggest the simulation-based scheduling using the discrete-event-based business process simulation. First, we analyze the ship hull production design process from the perspective of a job assignment to make it into the simulation model using DEVS (Discrete Event System Specification) which is the representative modeling method for a discrete-event simulation. Based on the APIs of the open-source discrete-event simulation engine, we implement the simulation using the Groovy script. We develop the scenario generator in which the user defines detail information of the construction drawing and its member blocks, and design engineers information, and the various setting for the simulation including the job assignment strategy. We use the XML files from this scenario generator as inputs of simulation so that we can get simulation result in forms of Gantt chart without changes of the simulation model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.