Abstract

Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project`s size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.