Abstract
The cooperative production system was proposed as an efficient production system to reduce the ship construction cost and to enhance the competitiveness for small/medium sized shipbuilder in the previous paper. In viewpoint of cooperative production system, the specialization of the FRP ship sizes has already been accomplished to reduce the number of the hull molds by FRP shipbuilders of the Sapjin industrial complex located in Mokpo area in 2003. There also exist lots of effective methods, as a cooperative production system, to cut down the construction cost. In this study, an effective production system in connection with the super structure and outfitting members is proposed such as the standardization of those items and specialized company which intensively produces the super structure and outfitting members at the collectivization area for cooperative work.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Society of Naval Architects of Korea
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.