Abstract

Researches to find suitable methods to combating floor lift require investigations of floor lift mechanism. The authors carried out a series of model experiments on floor lift in roadways. The floor lift is caused by many factors. In this report the authors describe the effect of two factors, i. e. a distance from roadway to upper coal seam and the thickness of weak floor to floor lift. For example whe a roadway has a depth of 600m from the surface, and the weak floor has a thickness of 8m, the roadway must be located at a distance of more than 30m from the upper coal seam in order to depress the floor lift. In our experiments the movements of weak floor were investigated also and the data to determine floor bolting parameters to combating floor lift were obtained.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.