Abstract
Shippers’ requests of freight trains vary with time, but generating an additional schedule of freight trains is not easy due to many considerations, such as the line capacity, operation rules, and conflicts with existing trains. On the other hand, an additional freight train schedule has been continuously requested and manually processed by domestic train operation companies using empirical method, which is time consuming. This paper proposes a model to determine the additional freight train schedule that assesses the feasibility of the added freight trains, and generates as many additional schedules as possible, while minimizing the delay of the existing schedules. The problem is presented using time-space network, modeled as multi-commodity flow problem, and solved using the column generation method. Three levels of experiment were conducted to show validity of the proposed model in the computation time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Korea Academia-Industrial cooperation Society
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.