Abstract

The vacuum system of the SPring-8 storage ring is being operated favorably without a serious trouble. The ultimate pressure of the storage ring reached approximately 9 × 10-9 Pa after the baking at 140°C for about 1 day. The beam-on pressure just before summer shutdown period decreased by about one order of magnitude as compared with that of the early stage of beam commissioning. The NEG re-activation without baking at summer shutdown period had effects on the improvement of vacuum pressure and the increase of beam lifetime. In this report, the pressure trend of the vacuum system is described as the beam commissioning of the SPring-8 storage ring progresses.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.