Abstract

Construction plan and strength control have limitations in construction production field because it is difficult to predict the form removal strength and development of specified concrete strength. However, we can have reasonable construction plan and strength control if prediction of concrete strength is available. In this study, firstly, the newly proposed strength prediction model with maturity method was compared with the logistic model to test the adaptability. Secondly, the determination of time of form removal was verified through the new strength prediction model. As the results, it is found that investigation of the activation energy that are used to calculate equivalent age is necessary, and new strength prediction model was proved to be more accurate in the strength prediction than logistic model in the early age. Moreover, the use of new model was more reasonable because it has low SSE and high decisive factor. If we adopt new strength prediction model at construction field, we can expect the reduced period of work through the reduced time of form removal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.