Abstract

In inner harbour of Incheon port, there are two lock gates (50KT, 10KT) which have two gates per lock gate in inner/outer sides except a gate in inner harbour side of 10KT. Due to the lack of the fore-mentioned gate, the use of 10KT lock gate is suspended in energy 3 years for regular maintenance. Now an additional gate is under construction in order to improve the efficiency of the 10KT lock gate. This paper will be aimed to evaluate the operational utilization levels of lock gates in present and future. The operational utilization levels of lock gates in 1998 are evaluated 0.2119 in 10KT lock gate, 0.2061 in 50KT lock gate which were considered the 46.5 closed days every 3 years for 10KT regular maintenance. The levels are estimated to 0.2246(10KT), 0.2539(50KT0 in 2006 and 0.2241(10KT), 0.2560(50KT) in 2011. The levels of 50KT lock gate in 2011 are evaluated to be more rapidly increased up to 24.5% from the levels in 1998.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call