Abstract
This study is to analyze location conditions for erosion control dams to be constructed in Chungcheongnam-do, Daejeon Metropolitan City, Chungcheongbuk-do and Gyeongsangbuk-do in order to establish proper conditions for erosion control dams in the future. 199 sites where erosion control dams are expected to be built in 2010 were chosen and investigated in terms of 12 factors including basin area, basin slope, and landslide risk. The results showed that erosion control dams for Chungcheongnam-do and Daejeon Metropolitan City are mostly impermeable gravity dams mainly composed of concrete. In contrast, Chungcheongbuk-do and Gyeongsangbuk-do are increasing the number of permeable or compound erosion control dams. Basin analysis at planned erosion control dam sites showed that at least 44.5% of the total area has high landslide risk. Gyeongsangbuk-do had the largest basin area for erosion control dam sites at 157.3ha, followed by Chungcheongbuk-do at 64.4ha and Chungcheongnam-do at 54.8ha. Analysis of sand deposits in the Chungcheongnam-do erosion control dam built in 2010 confirmed an average deposit of 971.8m3. The sand deposit capacity and amount of sediment control for erosion control dams have a very low correlation with basin area or flow path slope, and this needs to be addressed in future sand deposit capacity designs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.