Abstract

Increased cumulative running times of railroad vehicle brings out such degradation as wear and fatigue. It doesn't adapt corrective maintenance which repairs a poor part after a trouble but use preventive maintenance which fixes a bad part before a trouble There were a few researches for preventive maintenance such as inspect affairs and facilities management. They couldn't estimate the operation reliability on railroad vehicle Therefore, this study proposes the preventive maintenance procedure that predict repair period of end beam for uncovered freight car using reliability function and instantaneous failure rate on the basis of fatigue test and load history data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.