Abstract

This paper deals with a coal supply planning problem for power plants. We propose a mathematical optimization model to make decisions for coal pile sections, movement of reclaimers, and operation time of conveyor belts. The objective of the proposed model is to minimize the total operation time of conveyor belts and total movement time of reclaimers. The algorithm firstly selects a pile section by considering both the location of reclaimers and the stock amount on that pile section. And then the shortest path from the selected pile section has to be put into the operation schedule and check whether the total operation time is satisfied. Then finally the new schedule is updated. To this end, we have tested the proposed algorithm comparing with the general standard optimization package for the simplified problem SCSPP. From the numerous test runs for comparing with the existing coal supply scheduling methods, We see that the proposed model may improve the coal supply operation by reducing significant coal supply costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.