Abstract

As the competitive market system has been introduced to the electrical power trade, the priority concern would be that the price of electrical power should be reasonable. It is because, when this rule is solid, we can avoid the distortion of competition and assure the greater efficiency in management. LMP(Locational Marginal Price) means marginal price at each bus. This components consist of energy , loss and congestion cost. At this point, the LMP result that is calculated by traditional model is changeable by the location of the slack and can not be used in bilateral Transaction.<BR> This paper proposed algorithm is proved its rationality and credibility by comparing the result of the simulation of virtual 6_bus system that is calculated by traditional method, and showed that the LMP components are changed according to the Transaction Strategy. Furthermore, It shows the effect of additional congestion cost on the transmission line that has bottle neck frequently by simulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.