Abstract

This paper develops a multistage scheduling algorithm for the module operation of the LCD(Liquid Crystal Display) production systems and tests the efficiency of the proposed algorithm. The module operation is a multistage form composed of multiple sub operations of processes, and each stage is consists of multiple lines with the same kinds of machines. This paper presents a mathematical modeling reflecting the constraints of the LCD module operation and develops a multistage scheduling algorithm based on tabu search metaheuristic approach. For this purpose, an production order is assigned to a line of the sub operations and a sequence of the assigned order is rearranged to draw an efficient schedule. Simulation experiments test performance measures and show the efficiency of the proposed algorithm.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call