Abstract

When a high-altitude electromagnetic pulse(HEMP) power line filter is installed in a protection facility, the pulsed current injection (PCI) acceptance test is performed. A verification test is required even if the acceptance criteria are met. The injection current of the PCI generator may damage the external power source because a verification test is performed while the HEMP filter is connected to the power supply. Current decouplers have limited capacity and use; thus, they should be designed according to the actual environment. In this study, a decoupler is designed and fabricated for the PCI verification test. It is confirmed that the fabricated decoupler can be used as a protection circuit of the power supply by using a test-bed similar to that in the actual protection facility.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.