Abstract

In the DC electric railway system, the effective use of regenerative break energy is an important issue. Since regenerative break energy causes voltage rise or drop in the system, it should be also solved effectively. To solve the problems, applying electric double layer capacitor (EDLC) or voltage source converter (VSC) to the DC electric railway system has been studying. In this paper, the coordination of EDLC and VSC is proposed to solve the problem effectively with its coordinated control algorithm. The proposed method is tested to show its feasibility using Matlab/Simulink.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.