Abstract

The article considers coefficient A from the equation for estimating the residual resource of the construction facility by the age of building structures taking into account the condition of the construction object during commissioning, that is the quality of construction-installation work performed. The authors propose using two techniques for determining the coefficient A. The first technique uses the method of expert estimates. Based on it, the equations for calculating the coefficient A are derived. The second technique for estimating the coefficient A is based on the method of assessing the quality of construction and installation, proposed by A. Kh. Bayburin. In each of the proposed methods, there are advantages and disadvantages. Based on the proposed approaches, the authors have developed an algorithm for estimating coefficient A in order to eliminate or reduce the influence of the disadvantages.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.