Abstract
A composite pile consisted of a concrete lower part with a steel tubular pile at upper part was installed by pre-drilling method. Seven pairs of strain gauges and inclinometer were attached on the pile in order to measure stresses and displacement along the pile during the lateral loading test. The results of instrumentation were analyzed using various theoretical approaches. The back analysis showed that the measured stresses were smaller than those of the calculated. The maximum stress is measured at the steel upper part and decreased rapidly with depth of the pile. The calculated lateral displacement along the pile provide very good agreement with the measured values if the coefficient of subgrade reaction is selected properly. The design concept of a composite pile is verified by the measured stresses and displacement which is within the tolerable limits of the pile.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Korea Academia-Industrial cooperation Society
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.