Abstract
The use of lattice girder is increased rapidly as a substitute for H-steel ribs at the tunnel sites in Korea. Ground loads acting on the tunnel are supported by shotcrete and lattice girders. To assess the safety of the tunnel, it is essential to obtain field measurements for the lattice girders; however, lattice girder measurements have rarely been performed at tunnel sites, and the method of measurement is not well established. In the present study we suggest a load cell method for the instrumentation of tunnels with lattice girders. Actual measurements of ground loads acting on lattice girders are presented for a specific tunnel under construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.