Abstract

The smart grid, which is an integrated type of the power system and the digital network, requires the integration of a CIM(Common Information Model) standard for information modelling at the power control centers and an IEC 61850 standard for automation at the substation level in order to efficiently exchange the information between system elements. This paper describes the method of data transfer from one standard information model to the other standard unified information model by mapping between the objects of IEC 61850 and IEC61970 CIM standards both in the static and dynamic models, and designs the method of data transfer and information exchange between the topology processing application using unified topology class packages.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.