Abstract

To build environmentally friendly highways, we testes suitability for unique characteristics of pollution mitigation facility around the highways by evaluating optimal selections and implementation methodologies to minimize loan of non-point pollution substances into water-ways. To do this we categorized EIA target highways into three types ; big drainage basin, small drainage basin, and bridge section as to minimize non-point pollution of highway runoff. The terms of selected facility test based on the Natural and Manufactured Treatment Device were removal efficiency of TSS, BOD, COD, T-N, T-P, compatibility of site selection, economic feasibility, maintenance convenience, and the final mitigation facility.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.