Abstract
This paper measures power quality of bus in case electric charges about customer are imposed by each bus, supposed that can calculate this cost. When reflected this in system planning, expected cost proposed following method through sample system. To calculate nodal cost operating condition of power equipment calculates nodal cost[$/MVAH] supposing by situation that is optimized by OPF(optimal power flow) in system. The damage cost that is shed by fault that happen during year of loads in system that is linked on each bus was produced. As a result, proposed method was very effective in case of calculating bus total cost including power quality cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.