Abstract

In case of long time progressive construction work, we need contract sum adjustment due to escalation for a period of works and the process of applying, consistent and obvious criterion is required. In this study, it were attempted to figure out problem and study this rational improvement by giving examples based on core activities of escalation adjustment. Based on literature study and legal system analysis, we classified processes of contract sum adjustment for escalation and defined 20 core activities for each process. From this measured variable, we carried out case study by giving 37 examples of escalation. As a result of case study, problems of each process was found and we suggested rational improvement. As this study, providers will be able to waste budget and the other will be given smooth escalation adjustment.