Abstract

This paper presents a Petri Net (PN) based disassembly sequence planning model with precedence operations. All feasible disassembly sequences are generated by a disassembly tree and a disassembly sequence is determined using the disassembly precedence and disassembly value matrix, The precedence of disassembly operations is determined through a disassembly tree and the value of disassembly is induced by economic analysis in the end-of-life phase. To solve the disassembly sequence planning model with precedence operations, a heuristic algorithm based on PNs is developed. The developed algorithm generates and searches a partial reachability graph to arrive at an optimal or near-optimal disassembly sequence based on the firing sequence of transitions of the PN model. A refrigerator is shown as an example to demonstrate the effectiveness of proposed model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.