Abstract

The aim of this study to propose an efficient method in selecting the type of new and renewable energy applied in at the planning phase of buildings. This study applied geothermal energy facilities with high adaptability to buildings. This study considered the energy reduction and reduced cost by comparing the values with the energy consumption before applying of geothermal energy facilities. In order to propose more reliable criteria of economic evaluation, maintenance costs reflecting the replacement cycles and initial construction costs by drawings and specifications for installation facilities for practical geothermal energy based on construction statement for life-cycle cost analysis. The results will help to effectively select economic types of facilities for new and renewable energy of the planning phase of buildings.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.