Abstract

This paper proposes an agent-based scheduling method for semiconductor wafer fabrication facilities with hard inter-operation temporal constraints. The scheduling problem is to find the feasible schedules that guarantee both logical and temporal correctness. A proposed multi-agent based architecture is composed of scheduling agents, workcell agents, and machine agents. A scheduling agent computes optimal schedules through bidding mechanisms with a subset or entire set of the workcell agents. A dynamic planning-based approach is adopted for the scheduling mechanism so that the dynamic behaviors such as aperiodic job arrivals and reconfiguration can be taken into consideration.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.