Abstract

Nowadays, global warming derived from urbanization makes impact on the climatical and natural environment in the world. Also, water shortage from sharp population growth has increased because of impossible condition of the new reservoir construction that is one of sustainable water resource development. Accordingly, data survey for water rights have been required for limited water resources distribution effectively. Now, Water Management Information System(WAMIS) has gathered domestic water rights data according to various criteria as follows: living, industrial, and agricultural use purposes for specific year based on watershed, basin, river size. In this study, Water Rights Analysis Package (WRAP), one component of Texas Water Availability Model (WAM) system, is applied to multi-purpose Soyang Dam with monthly flow, evaporation, and precipitation. Also, water rights data are utilized into two types: natural and priority order water rights. The application results indicated that two types of water rights provided the insight for establishing various reservoir operation plans under flood, normal, and drought periods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.