Abstract
The importance of the power distribution planning is increasing due to expansion of distributed generation in distribution system. The distribution planning is based on accurate load forecasting. Recently, machine learning-based load forecasting models have been developed and applied in distribution planning. However, since the performance of the machine learning-based load forecasting model depends on the combination of input variables, it is important to select input variables. This paper proposed the process of selecting input variables for an ensemble based load forecasting model. The input variable of the distribution line load forecasting model was selected through correlation analysis of predictable input variables, then the improvement of forecasting performance with selected input variable was analyzed by comparing the forecasting and the actual value. In addition, the importance of the selected input variables and the validity of the proposed process were analyzed through XAI analysis.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The transactions of The Korean Institute of Electrical Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.