Abstract

To achieve the safety and reliability, RAMS activity for a railway signal system of Near Surface Transit is studied. In this paper, preliminary hazard analysis in RAMS activities is studied for the railway signal system of Near Surface Transit. Preliminary hazard analysis is done through automatic train protection, automatic train operation and automatic train supervision. The hazards are defined, then causes and consequence for each hazard are defined. The total 75 preliminary hazards are classified. For high severity hazards are changed to acceptable level by upgrading of system requirement specification.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.