Abstract

In this paper, we suggest an optimization method which can save about 5[%] of the cost though the optimizing of configuration and capacity for the facility. To achieve this goal, we compared the design data of the power, motor and drive system with the actual operation data of the plate mill plant in K-Steelworks. Therefore we measured the actual loading data by facilities considering the operating conditions of the plate mill plant in K-Steelworks, after that analyzed these data. In addition, we review the optimal capacity for transformer, switchgear and drive, and also reconfigured the electrical room and power single line diagram through the validation of motor data by equipment and the confirmation of process data considering the load characteristics. Consequently, the optimization method of capacity for the facilities shall have effectiveness in building new plate mill plant to further reduce costs at future.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call