Abstract

Nowadays we have to handle the tasks for volume determination of surge pile materials (sand, coal, crushed stone) on industrial objects and building grounds. The type of work is necessary for keeping record of supplied and consumed materials, and also for their piling. This article gives com-parative analysis of 3 calculation methods for land works (horizontal sections, cone, vertical parallel section) in AutoCADCivil 3D. The object of research was the sand, delivered and piled in the Novosibirsk river port. The sand is a rather difficult substance to be calculated as it gets settled down in wet condition and blown away in dry one. The results of the research showed that the most accurate method for sand volume calculation is vertical parallel section one in AutoCADCivil 3D.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.