Abstract

Recently, world leading companies on manufacturing field are trying to adopt a PLM methodology, which is a new production paradigm, for a survival and strengthening the competitiveness. Some projects for a digital shipyard including a methodology of a digital simulation framework are going on by Seoul national university and Samsung heavy industry. A Database methodology for a scheduling data, an interfacing methodology for a simulation input and output, and a synchronized simulation related methodology are required for enhancing the value of the digital simulation for shipbuilding. In this paper, such a methodologies and a related case study for a fabrication factory and an assembly factory are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.