Abstract

SEAWAT, a linked modeling program of Visual MODFLOW was used to analyze the change in groundwater levels and salinity related groundwater dam construction in Cheongsan island, Wando-Gun, Jeollanam-Do. The steady-state model results show the groundwater flow and salinity distribution of the studied area. The groundwater flows from north-west and south-east highlands into the river, located in the middle part of the basin, and is eventually discharged to the ocean. Part of the sea water infiltrates into the river; and through the estuary`s alluvium aquifer, the sea water intrusion takes place spreading to about 830 m from the ocean. The transient model results show that after the groundwater dam construction, groundwater levels will rise to a maximum of 2.0 m upstream, and the groundwater storage will increase 21,000 after 10 years. Meanwhile 31% of the total area affected by sea water intrusion will decrease. To conclude, the groundwater dam is a very useful method for a secure water resource in preparation for drought and water shortages in the island regions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.