Abstract
In this article a literature review of existing delayed coking plants is carried out, and the design features of domestic and foreign coke chambers are revealed. With the help of the final engineering analysis program Ansys, models of reaction apparatuses of these installations are constructed for various material designs. It is revealed that it is impossible to increase the efficiency of operation of the current devices without a significant change in the technological regime, and technological solutions are proposed for the design of new reactors of delayed coking plants. Models of reactors of the modern delayed coking plant and the Soviet type 21–10/700 with minimization of the number of horizontal welds are constructed, and economic calculations are made for the operation of coke chambers with various designs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.