Abstract

Intra-block remarshalling is the task of rearranging into some target bays those containers which are scattered within around the block. If multiple transfer cranes installed in the block are all used together we may be able to complete the remarshalling task as early as possible. However, when multiple cranes are used simultaneously, there may occur significant delays if we do not carefully consider interferences between the cranes at the time of scheduling. Especially, delays caused by interferences occur more frequently in case of using non-crossing cranes. This paper presents an efficient heuristic method for assigning moves of containers to each crane and for determining an appropriate container moving order in a manner sensitive to the interferences. Simulation experiments have shown that the proposed method can effectively reduce delays in various environments.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call