Abstract

The present study was conducted to determine whether ESCO Business is success or not. ESCO Business recovers the investment costs by the energy savings resulting from complementing existing energy facilities. The guaranteed parameters are Quantity of Heat Recovery, and Generator output drop. The results of the Performance Test show that the Quantity of Heat Recovery increased by 11.52 Gcal/h, and Generator output decreased by 0.234 MW, which satisfied the guarantee value.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call