Abstract

This study evaluates wind farm efficiency at Haengwon in Jeju Island. The actual energy production at Haengwon wind farm is compared with the estimated energy production based on Korean wind map which is developed at the National Institute of Meteorological Research/KMA. The validation of wind map at Gujwa located near the Haengwon wind farm shows that the wind speed is overestimated. The diurnal variation of wind speed shows a maximum value in the afternoon due to the effect of sea-land breeze. The ratio of the actual energy production at Haengwon wind farm and the estimated energy production based on the Korean wind map is 24.8%, while the distribution of energy frequency is similar each other. The difference of energy production is caused by mechanical error of the turbine and the overestimation of the simulated wind map. This study will contribute to the repowering of turbines for improving the efficiency of wind farm in the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.