Abstract

With Korean Government’s Renewable energy 3020 plan, the penetration of DERs in Korean grid will raise to 20 percent of the total generation rate by 2030. Especially, with Interconnection guarantee policy for small generators by Korea’s power corporation, KEPCO, established in Oct, 2016, DERs interconnection delay due to lack of allowable distribution hosting capacity occurred and reduction of expanding cost for distribution facilities where 70% of DERs in South Korea are installed became one of important issues of KEPCO. Therefore, KEPCO needs to extract reasonable measures to increase feasible hosting capacity of distribution feeders in order to reduce expanding facilities cost under the condition of no matter in distribution system operation.<BR>This paper proposes feasible hosting capacity of distribution feeders that can be adopted and the status of DER installation in distribution system, PV generation data, minimum load data in distribution feeders.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call